top of page

Preliminary Quote Request & Agreement Terms:

The final calculations and report generated will be based on the documentation provided by the client; (IE: Architectural & M E P Plans, Survey Documents of the current or proposed building design) see plan document requirements on pages 6 & 7 of the attached project estimate form.

A preliminary report is generated to verify if the proposed Building, Lighting, or Mechanical systems are in compliance with the current Energy standards. A non-refundable base set up fee of $350.00 is due upon acceptance of the attached quote by the client.

Mechanical & Energy Plan Review of specific equipment and relevant code requirements. (Equipment sizing will not be reviewed)

M+ECCC Estimate  app.jpg
Project Estimate Form
(Download pdf )
CA CZ INFO REQUEST.jpg

Request Complimentary
Climate Zone specific Envelope Criteria
for your California based  Project!

EC PROCESS IMAGE_edited_edited_edited.jp
Energy Compliance File Setup Fee Details
MPR PROCESS IMAGE_edited.jpg
Plan Review Setup Fee Details
bottom of page